Vault-1

V.T.D.001-0v5

First time out of the vault
(Author Note: This is just the teaser of a soon to be ever expanding fan fiction about a mysterious vault not hell bent on destroying the lives of its inhabitants.)


Vault-Tec Vault. Model Number-001.

Started Construction. September 30 2017

Ended Construction. October 23 2077

Expenses. Initial estimate 12.8 Trillion USD. Ending cost total. REDACTED.

Size. 320,000 sq. at 1,000 feet underground covering 120 billion tons of US soil.

Occupants. 12,000.

Duration. 300-Indefinite

Computer System. Zax 3.2 Super Computer

Backup Computer System. Dirisha 98

Primary Power Supply. City Sleeper Geo-Thermal

Secondary Power Supply. General Atomics Tsar Power Module

Standard Equipment. P.I.P. Boy REDACTED

Non-Standard Equipment. REDACTED, Future-Tec MK-I Gene
Manipulation computer, Vault-Tec M200 Water Purification System, G.E.C.K.-V.2, REDACTED, Future-Tec MK-9 Virtual Reality Simulator, REDACTED, Med-Tec MK-8 Fertility Manipulator, Other Equipment to be fabricated and constructed on site.




Advertisement. Dear [name]. You have been chosen a to survive the Nuclear Armageddon free of charge in one of our premier Vault-Tec vaults due to your excellent performance in [job] Vault-Tec. In exchange for another wonderful opportunity offered to you by Vault-Tec we only require for your duration and that of your future generation to pursue your exact profession of [job] Vault-Tec for a period of time decided by us at a later point. No longer will you and your family fear the possibility of instant nuclear detonation vaporization via enemy nuclear weapon! To fully undertake this wonderfully generous opportunity and ensure the highest probability of safety for you and your family we highly advise that your report to Vault-Tec Vault-1, location 42.562437,-116.114792 as soon as possible.

Vault-Tec Industries
 
Back
Top